Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Work on Panvel-Indapur stretch to be completed by December, 2024

Thursday, 13 Jun 2024
Share this on :

The 84-km stretch between Panvel and Indapur Mumbai-Goa highway is expected to be completed by December this year, as per the National Highway Authority of India (NHAI).

Pre-monsoon works are currently underway, with precautions in place to ensure smooth traffic flow during the monsoon season. The 84-km-long stretch of the highway has been divided into two packages. Package one, which covers 42.3 km from Panvel to Kasu, has achieved over 85 percent physical progress, and approx. 39 km of the 40 km of road concreting has been completed. 

Furthermore, in about nine km of the 23.7 km of parallel service road concreting work is finished. Additionally, work on the vehicular underpass at Gadab in Pen taluka is also progressing. In Package two, covering 42.3 km from Kasu to Indapur, 26.67 km of four-lane work has been completed by the previous contractor. The remaining work has been awarded to Kalyan Toll Infra. Currently, around 45 percent of the physical work in this package has been completed.

New Password
Confirm Password