Suzlon Energy has secured an order to develop 48.3 MW wind power project for Adani Green Energy.
The company will install 23 units of wind turbine generators (WTGs) with a hybrid lattice tubular (HLT) tower and a rated capacity of 2.1 MW each.
The project is located in Mandvi, Kutch, Gujarat and is expected to be commissioned in 2023.
The scope of work involves supply, installation, and commissioning. The company will also offer post-commissioning operation and maintenance services.