Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Port Blair airport to get terminal building by October

Friday, 20 May 2022
Share this on :
A new terminal building at the Port Blair airport will be built by the Airports Authority of India by October 2022. 
 
The new terminal building is being constructed at a cost of approximately Rs 707.73 crore. 
 
The new terminal building will have a total built up area of 40,837 sq mtr. The terminal building will be capable to handle 1,200 passengers during peak hours and around 40 lakhs passengers annually. 
 
The new passenger terminal building will have three floors comprising lower ground, upper ground and first floor.  
 
Along with new terminal, additional parking bays are also being constructed at the airport. More than 80 percent of the work has been completed.
New Password
Confirm Password