The National Highways & Infrastructure Development Corporation has invited three separate bids for widening to two-lane with hard shoulder of Akegwo-Avangkhu section of NH-202K in Nagaland on EPC mode under NH (O)-NE.
Package-I includes works from design chainage 0.000 km to 34.975 km at a cost of Rs 257.22 crore.
Package-II will see works from design chainage 34.795 km to 69.875 km at a cost of Rs 285.19 crore.
Package-II involves works from design chainage 69.875 km to 106.816 km at a cost of Rs 323.59 crore.
The construction period of each package is 30 months.