Diamond Power Infrastructure (DPIL) has received a letter of intent (LoI) for an order of Rs 899.75 crore from Adani Energy Solutions (AESL) for the supply of conductors.
The AL 59 Conductors - New Generations Aluminum Alloy Conductors, are to be supplied to various SPVs under the TPCB projects of AESL. The MOM duly accepted dated on 09 July, 2024 has been awarded on 'Km rate basis with PV Formula” .
The contract is to be completed by April 2025.