Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Centre sanctions Rs 152-cr package for road upgradation in J&K

Monday, 19 Feb 2024
Share this on :

The Centre has sanctioned a Rs 152.30-crore package for upgrading 12 roads having a total length of 134 km and a bridge project in Jammu and Kashmir. The package under the Pradhan Mantri Gram Sadak Yojana (PMGSY) was approved by the Union Ministry of Rural Development.

With this, a total of 233 road projects spanning 1,750 km and 66 bridges falling in the alignment of these roads have been sanctioned for upgradation at an estimated cost of Rs 2,245.46 crore under PMGSY-III programme for J&K. The PMGSY programme was launched in 2001-02 to provide connectivity to unconnected habitations with a population above 250. Under this programme, 2,140 rural habitations were found eligible to be connected.

For this, the Ministry of Rural Development sanctioned 3,425 works, including 239 bridges (2,741 new connectivity works and 684 upgradation works), under PMGSY-I and II for the construction of 19,049 km of roads at an estimated cost of Rs 12,565 crore. J&K has achieved 98.50 per cent of the target under PMGSY- I and II. Nearly 2,118 habitations have been connected so far and the remaining 23 are likely to be connected by March. A total of 17,985.10 km of roads has been constructed under the scheme.

Under PMGSY-III 521.09 km of road length has been upgraded so far at a cost of Rs 11,723.57 crore. Jammu and Kashmir has performed exceptionally in making progress and achieving goals under the PMGSY since 2019, constructing 9,000 km of roads.

Notably, the union territory ranked third at the national level in 2020-21 and 2021-22 in terms of road length constructed in a year.

New Password
Confirm Password