Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

BHEL secures order for nuclear steam generators from NPCIL

Friday, 09 Jul 2021
Share this on :
Bharat Heavy Electricals (BHEL) has won a major order for supply of 12 steam generators from the Nuclear Power Corporation of India (NPCIL).

The order valued at Rs 1,405 crore has been won under NPCIL's Fleet Mode procurement programme and mandates supply of 12 steam generators for India's highest rated indigenously-developed 700 MWe Pressurized Heavy Water Reactors (PHWR) to be set up at four different locations in the country.

The steam generators will be manufactured at BHEL’s Tiruchirapalli plant, Tamil Nadu.

Significantly, this is the second major supply order secured by BHEL through competitive bidding for the Fleet Mode implementation programme of 10 x 700 MWe Nuclear projects by NPCIL.

The first equipment order secured by BHEL under this programme, for the supply of 32 Reactor Header Assemblies, is currently under execution.

BHEL holds the distinction of being the sole Indian company to be associated with all the three stages of the Indigenous Nuclear Power Programme of the country and has emerged as the leading partner for NPCIL over four decades now. Notably, nearly 75 percent of PHWR-based nuclear power plants in India are equipped with BHEL-supplied turbine and generator sets (the balance being imported sets).

BHEL has also emerged as the L1 bidder in another Rs 10,800 crore tender of NPCIL for six x 700 MWe Turbine Island Packages.

New Password
Confirm Password