Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Ather Energy plans to build third plant in Maharashtra

Monday, 17 Jun 2024
Share this on :

Electric vehicle maker Ather Energy has chosen Aurangabad in Maharashtra to set up its third plant. An agreement in this regard is expected to be signed soon.

The plant will be located in Bidkin town in Aurangabad, and would be built in phases across 100 acres. The company plans to invest Rs 1,000 crore in the plant.

Ather's two other plants, an assembly unit and a battery plant, are located in Hosur, Tamil Nadu. Earlier this month, Hero MotoCorp acquired an additional 2.2 percent stake in Ather Energy for Rs 124 crore.

The Bengaluru-based company is engaged in designing, manufacturing, servicing, software development, in relation to electric automobiles and charging infrastructure. It is also involved in storage, distribution, and management systems of electric power  and other ancillary services. Ather Energy posted a revenue of Rs 1,753.8 crore in FY24.

New Password
Confirm Password