Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Titagarh Rail Systems production for Bangalore Metro Phase-II

Friday, 14 Jun 2024
Share this on :

Titagarh Rail Systems (TRSL) has announced the commencement of production of trainsets for Bangalore Metro Rail Corporation (BMRCL) Phase-II Yellow Line project,  as part of a contract with China Railway Rolling Stock Corporation (CRRC).

The original contract between BMRCL and CRRC Nanjing Puzhen signed in December 2019, had faced challenges which led to delays. To address this, CRRC entered into a memorandum of understanding (MoU) with Titagarh Rail Systems. Under the MoU, Titagarh will manufacture 34 trainsets at its facility in Uttarpara, West Bengal.  Only two trainsets, comprising 12 coaches, will be manufactured in China.

The 21-km Yellow Line, extending from RV Road to Bommasandra, is expected to enhance connectivity and reduce traffic congestion in Bengaluru.

 
New Password
Confirm Password