North Central Railway (NCR) has issued a tender for the construction of an important bridge in connection with Chunar-Chopan doubling project in Uttar Pradesh.
The work comprises Bridge No. 399 Span (2x30.5m, plus 14x76.2m) at km 143/2-24 between AGY to CPU at Sone river, and is to be completed in 30 months. The work is to be completed at a cost of Rs 230.33 crore.
The due date to submit the bid is 11 September, 2024.