Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Tata Power Solar commissions India’s largest floating solar power project

Monday, 27 Jun 2022
Share this on :
Tata Power Solar Systems, a wholly-owned subsidiary of Tata Power, has commissioned India's largest floating solar power project in Kayamkulam, Kerala. 
 
The solar project is spread over 350 acre water body, backwaters area, having an installed capacity of 101.6 MWp. 
 
The installation was completed within the stipulated period. The company has built a scaffolding platform on the water body to make the entire solar plant float on water. This project is the first one in the floating solar photovoltaic (FSPV) through power purchase agreement category. 
 
This plant boasts a floating inverter platform having five MW capacity. The entire project is anchored to the waterbed of Kerala backwater using 134 cast pile foundations that are bored to a depth of 20 mtr underwater to support the Central Monitoring and Control Stations (CMCS) and 33/220 kV switchyard. 
 
The entire array involving floats and solar panel modules had to be towed for three km on a sea-linked national waterway, which was 15 mtr deep. 
 
Tata Power Solar 's execution team has been able to synchronise the 33/220 kV air insulated substation (AIS) with 220 kV existing gas insulated substation (GIS). A power purchase agreement (PPA) has been signed with a PSU client, wherein the entire power generated from this plant will be used by Kerela State Electricity Board (KSEB).
 
Post Your Comments


  
REGISTER AND GET STARTER KIT ABSOLUTELY FREE!

Free access to Project News and Analysis

Project and Tender Alert in your mailbox

Explore the largest Database on Projects for free

Be part of Online Projects Community

User login
Start Exploring

Subscribe to any of our premium plans to

Access to complete information on 43000+ projects

Use our Notification service for instant update on projects and tenders

Closely monitor your opportunities with "WORKSPACE"

Use our online platform for promotions of your products and services