Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

NHAI declares L1 bidder for Sherpur-Dighwara bridge

Monday, 20 Mar 2023
Share this on :

On March 17, 2023, the National Highways Authority of India (NHAI) declared SP Singla Constructions (SPSCL) as the lowest bidder (L1) for the construction of a new 9.45 km long bridge between Sherpur-Dighwara as part of the 137 km Patna ring road (NH131G). The project is valued at Rs 4994.79 crore.

The project scope includes the construction of a six-lane bridge and its approaches across the Ganga as part of the Patna ring road (NH131G) in Bihar, beginning at km 8.480 near Sherpur and ending at km 23.000 near Dighwara.

This six-lane bridge over the Ganga river will be the second connecting Danapur and Saran districts. The project consists of five km of approach roads on either side connecting NH-30 (Danapur-Maner road) and NH-19 (Dighwara bypass road), totalling 14.52 km.

S. A. Infrastructure Consultants prepared the detailed project report (DPR) for the Bharatmala Pariyojana (BMP) Lot-5/Package-7. In February 2023, the state government of Bihar approved Rs 316 crore for the acquisition of 86.12 hectares of land for its construction.

The project is expected to be completed in 3.5 years. It will be implemented on engineering, procurement, and construction (EPC) mode.

 

New Password
Confirm Password